TAASIR :– S M HASSAN –17 AUGUST
Kolkata, 16th August, 2024
Ministry of Railways has sanctioned the Final Location Survey (FLS) for the following projects of South Eastern Railway for preparation of Detailed Project Report (DPR) at a total cost of 1.4680 Crore.
SL | Name of Projects | Approx. length
(in Km) |
Cost in Rs. |
1 | Doubling of Mohuda Khanoodih Gomoh section | 22.4
|
44,80,000/- |
2 | Direct connectivity between Tata Marshalling Yard and Tata-Badampahar route | 05.0
|
10,00,000/- |
3 | Double line Bypass from Jakpur to Benapur avoiding Kharagapur and Nimpura Yard with Fly over at Benapur and Jakpur in Down direction to avoid surface crossing | 11.0
|
22,00,000/- |
4 | Fly over at Rupsa for connecting Kharagpur – Bangriposi and Bangriposi to Bhadrak to avoid surface crossing. | 35.0
|
70,00,000/- |
Total | 73.4 | 1,46,80,000/-
|